Sunday, February 03, 2019

Racoons


It's highly unusual to see racoons during the day. However, here we are just after lunch, and we have visitors in the back yard. When we opened the patio door, this one quickly climbed into one of our conifer trees that has served as racoon hangout in the past.


I was just about to turn away, when I saw movement in the far corner of the backyard. "Hey, there's another one!"


He was nice enough to demonstrate the most convenient route for travel through the neighborhood. The rear fencing connects the backyards of two dozen homes.


Saturday, February 02, 2019

Fire in the hole!


The gas-fired kiln at Blossom Hill Crafts is running tonight.
Nice and warm here with all the rain outside.


Bearded Dragons: Eggs!


I noticed this morning that one of the caves in the terrarium was completely closed up with sand and wondered whether Hera had indeed laid eggs. She had been test digging for the last couple weeks, so it was about time. ... And I was right! Pascal and I carefully dug out 13 eggs. A new record. They also look much healthier than last year's production. It's unlikely that all of them will survive. Zeus managed to steal one when I wasn't paying attention, so we now have 12 eggs left.


They have now moved to damp beds of Vermiculite in the Incubator. Let's see how this works out...


Rain!


This weekend's "winter storm" is not quite as strong as expected, but nevertheless it's a major event and we love the sound of rain on the roof and wind howling around the house.

Thursday, January 31, 2019

Module 1: Terraforming


While the pink foam sheet yield a very lightweight surface cover, it's also perfectly flat, which doesn't look particularly natural, unless your layout is set in the far North of Germany. I dressed up the sides of the track board with more pink foam and shaped it into an embankment with a basket rasp. While at it, I also carved the drainage ditch.

Next I hit one side of the module with the jigsaw, cut a light depression into the side, and used the basket rasp to even it out again.


I applied Scuptamold tinted with brown paint to tie it all together.


The cutoff from the one side was glued to the other side and backfilled with more pink foam cutoffs. More terraforming and shaping will happen once the glue is dry.


Light


This looked just weird enough that I had to put it here.

Google+ going away


You might have heard about Google shutting down it's attempt at social networking, Google+.
I know there are several readers that follow this blog through the automatic posts Blogger creates in my Google+ account.

After April 2nd, and possibly earlier, that will no longer work. All content on my Google+ page will become inaccessible and be deleted eventually. I invite you to follow my blog at http://blog.lostentry.org/ instead, or point your favorite RSS reader (such as Feedly) to that URL.

Thank you for visiting.

Tuesday, January 29, 2019

Module 1: It works


Test setup at the work bench. Module 1 and the experimental module end are connected, hooked up, and have power. I tried with a a few locomotives and didn't run into problems. As mentioned before the real test will be with the turnouts on the next module. Moving on to painting the rails and ballasting.


Sunday, January 27, 2019

City by the Bay


On the way home from Novato, I stopped at the Frontage Road along I-80 in Berkeley, and enjoyed the view across the water for a few minutes.

2019 SIG meet Petaluma: Sunday


My operating session today was at the Central Vermont Railway, a new layout focused on Timetable and Train Order operation. I ended up being the conductor on two trains, one in the morning and one in the afternoon. This model railroad runs impressively well and is a lot of fun.

Regular readers might have noticed by now that I love railroad paperwork. Timetable & Train Order operating layouts produce a lot of paperwork, and this layout is no exception.

Here you see me as conductor on Extra 1701 North, and I'm obviously waiting for something. What happened?


The CVR runs two-man crews, so for the afternoon session we reported to duty as conductor and engineer for a 12:50 pm departure and picked up our paperwork. Clearance Form B shows that the preceding northbound passenger has left a few minutes earlier and all other higher priority trains have arrived or departed.


Extra 1367 is working a few miles north of us and will expect us after 1:30pm. They are also told to expect southbound train 738 after 1pm. Hmmmm. According to the schedule, train 738 was supposed to have arrived in East New London at 11:27am. Hint, hint, hint, ...
However, when I read the order during the session I concentrated on the first part telling me where to expect Extra 1367.


The other order is the authorization to occupy the main line and run north from East New London to Brattelboro.


I have a clearance. I have authority. I know there's someone ahead of us. I'm told all superior trains have arrived or departed. We're ready to go and pull out of the yard onto the main line. At the north end of the yard is the train register where all inbound and northbound trains are logged.


I double-check the schedule, the only opposing train that could possibly interfere with us is train 738, so I verify that train 738 signed the register... Uh oh, they did not. We're on the main line and we are on their time, so I tell the engineer to pull into the engine siding at the north end of the yard to clear the main line. Head-scratching ensues. My paperwork is obviously not consistent with reality. I chat with the yardmaster and walk back to the East New London station agent, while the engineer sits in the siding with the train.


The station agent checks in with the dispatcher and eventually confirms we'll get additional orders. Since all orders are dictated to the station agent by the dispatcher over the phone and the dispatcher has to run the rest of the railroad as well, that will take a while. We can't leave until we have orders. This is when the photo above was taken.

Eventually, we got additional orders with another clearance form B, this time advising on trains 430 and 738 and I know from the schedule that southbound first class passenger train 4 is also coming our way later in the afternoon.


In the first order the dispatcher sets up an explicit meet for us to meet train 738 in Montville, which is 5 miles north from East New London Yard.


With the second order the dispatcher lets us know that train 430 is running 3 hours behind schedule. Taken together the two orders allow us to occupy the main line to Montville, work in Montville and beyond until it's time to meet train 430.


By 5:35pm we have made it to Norwich, where Extra 1367 has been expecting us for the last few hours ...


Half a dozen sheets of paper and several fast-clock hours of work to move a train.


I very much enjoy this low-tech way of running a railroad, but it really only works well on large layouts like this where distance between sidings, the interaction between dispatcher, station agents, and engine crews contribute to the mental exercise of working with and interpreting orders and the schedule. And sometimes you get stuck in a siding for a while, especially if you're an Extra in the Inferior Direction of the railroad.

Good Morning, Petaluma!


Petaluma Marsh at Sunrise

Saturday, January 26, 2019

2019 SIG meet Petaluma: Saturday


This year the SIG meet is in Petaluma. As usual the clinic program covered several interesting themes and ideas around operations and layout design. Paul Weiss gave an update on his Central Vermont Railroad layout. Jon Schmidt talked about how he made JMRI Ops do what they needed on the CVR. After lunch Bill Kaufman looked back on how his State Belt layout evolved and could have evolved. Ed Merrin gave a retrospective on his NWP layout depicting scenes between Petaluma and Willits. The day wrapped up with a design challenge for building a layout centered around Klamath Falls, CA, which attracted several very different ideas and approaches. Chatting with other attendees in the breaks and over lunch adds to the friends-helping-friends atmosphere of this event.


The traditional evening layout tour took us first to Paul Weiss's CVR. Wow! They made some impressive progress here in the last 12 months. I will operate on this layout on Sunday and am very much looking forward to it.


I hadn't seen Ed Merrin's layout yet, and after his talk this afternoon I was quite keen on it. Beautifully done scenery with a great eye for California colors and atmosphere.


One of the topics Ed touched on in his talk was how he built his helixes and used cuts and scenic vignettes to soothe impatient operators waiting for their trains to reappear from the helix.


Notice how the Highway 101 bridge covers and hides the portal into the helix.


A relatively easy and effective vignette is to cut a window in the helix outside, and add some scenery around the track. I've been thinking about doing something like this for one of the passenger stops of the Murrbahn project and here I see an example of how to actually do it. Nice!
The building on the lower level makes the transition from layout deck into the helix less jarring.


We wrapped up the day with a long discussion about German prototype operations practices and how to adopt them at Peter Barnes' layout set around Bavaria and Austria.

Friday, January 25, 2019

Silicon Valley Lines January Ops


Tonight we had the first Ops session after the holiday break. It was very well attended and we completed the full schedule well before the planned session end time. Here's the Nowheres Yard Switcher on track 1 of the passenger station.

Wednesday, January 23, 2019

Yountville


Yountville is a neat little town north of Napa. Yes, it's touristy and filled with the usual wine tasting bars, restaurants, and antique stores, yet their train station is neat. It's no longer served by passenger trains, unless you count the "Napa Valley Wine Train" dinner train.


Next to the train station is a row of cabooses that make up the rooms for the Napa Valley Railway Inn.


Several stores and restaurants in the area have railroad-related names, which I found amusing.

Monday, January 21, 2019

Module 1: Wiring is done


Eating too many vegetables

Module 1: Electrical


I'm almost done with wiring up module 1. Another late evening job, and I sure hope this is actually going to work, since I have not tested the track yet. If it doesn't, ... well, at least I've gone through the motions once and know what to do for the next module.

I really like working on cabling this way. I sit or stand at the work bench, tools in front of me, soldering iron on the side. I can turn the module for convenient access, or rotate it like in this shot from earlier in the evening


No fuzzing around under the layout. Really nice.


The module is much lighter than a layout, so while it stands easily, it also easily tips over. But with no scenery on the other side yet, I can put it on its face as needed, too.