New office location. Different breakfast options. Same sun.
Thursday, November 08, 2012
More box cars
I was lacking a sufficient number of "real" box cars ("Gedeckte Gueterwagen") so Maerklin's new 2012 release of the 00776 display set came at the right time. Robert Frowenfeld from rjftrains had a good pre-order deal so I jumped on it in February. The shipment came in today.
These are Gbs 256 sheet piling wall box cars, not exactly one of the most common cars around on the prototype, but a good example for modern cars in the late 60's and early 70's.
The cars look really good as far as brown freight cars go. The molding is nice and crisp. Lettering sharp, legible, and as far as I can tell correct. Grab irons are present and iirc in the right places. Maerklin also molded the brake handles, though as usual didn't get the release valve handles correct (they are mirrored when they shouldn't be). I'm sure the rivet counters will be all up in arms about that. Some cars in the set are factory-weathered. The weathered look is nice, but I'll hold judgement until I see them on the layout.
I can now retire some of the really old box cars I'm running on the layout, but will need to revisit maximum train length. The new cars are quite a bit longer than the somewhat compressed cars from yesteryear. It might turn out that a 9 car train is now too long for the sidings and storage tracks.
These are Gbs 256 sheet piling wall box cars, not exactly one of the most common cars around on the prototype, but a good example for modern cars in the late 60's and early 70's.
The cars look really good as far as brown freight cars go. The molding is nice and crisp. Lettering sharp, legible, and as far as I can tell correct. Grab irons are present and iirc in the right places. Maerklin also molded the brake handles, though as usual didn't get the release valve handles correct (they are mirrored when they shouldn't be). I'm sure the rivet counters will be all up in arms about that. Some cars in the set are factory-weathered. The weathered look is nice, but I'll hold judgement until I see them on the layout.
I can now retire some of the really old box cars I'm running on the layout, but will need to revisit maximum train length. The new cars are quite a bit longer than the somewhat compressed cars from yesteryear. It might turn out that a 9 car train is now too long for the sidings and storage tracks.
Tuesday, November 06, 2012
Saturday, November 03, 2012
Timesaver in N-scale
I've been toying with a timesaver module before using Bauspielbahn parts.
Last year I started to build an N-scale version. That project fizzled after a while, and the module was stored in the garage for most of last year. The baseboard is only 1 x 5 feet, so it wasn't much in the way, and, as can be seen on the photo, that leaves plenty of space for "scenery".
The module is fully wired up and operational. The Rapido couplers on my existing N-scale cars were not very good for switching, so I installed Microtrains trucks with knuckle couplers to match the little Diesel switcher. Replacing the trucks was reasonably easy on most cars.
This afternoon I sat down for a little while, cleaned tracks, hooked up power and indeed, the little thing actually works. It has some minor connectivity issues that should be easily fixable with some soldering and a couple extra power feeds.
Now, ... the point of the Timesaver is to act as a switching puzzle. I needed a way to define where cars are supposed to be spotted. I used Lego bricks on the Bauspielbahn-Timesaver a few years ago to give each car a color identity, and randomly placed matching Lego bricks at the loading spots.
For the N-scale version I wrote a script that shuffles assignments and delivers the result on a Web page in ASCII art. Not pretty, but functional and perfectly sufficient for the purpose.
Each car has a distinct color, which makes spot assignments very simple. Using the switcher locomotive the operator moves cars to their assigned spots. Then we start over.
Last year I started to build an N-scale version. That project fizzled after a while, and the module was stored in the garage for most of last year. The baseboard is only 1 x 5 feet, so it wasn't much in the way, and, as can be seen on the photo, that leaves plenty of space for "scenery".
The module is fully wired up and operational. The Rapido couplers on my existing N-scale cars were not very good for switching, so I installed Microtrains trucks with knuckle couplers to match the little Diesel switcher. Replacing the trucks was reasonably easy on most cars.
This afternoon I sat down for a little while, cleaned tracks, hooked up power and indeed, the little thing actually works. It has some minor connectivity issues that should be easily fixable with some soldering and a couple extra power feeds.
Now, ... the point of the Timesaver is to act as a switching puzzle. I needed a way to define where cars are supposed to be spotted. I used Lego bricks on the Bauspielbahn-Timesaver a few years ago to give each car a color identity, and randomly placed matching Lego bricks at the loading spots.
For the N-scale version I wrote a script that shuffles assignments and delivers the result on a Web page in ASCII art. Not pretty, but functional and perfectly sufficient for the purpose.
Each car has a distinct color, which makes spot assignments very simple. Using the switcher locomotive the operator moves cars to their assigned spots. Then we start over.
Sunday, October 28, 2012
Bad Mojo Day
Never a good idea to get up late on a Saturday morning. Too many things went wrong yesterday.
Along the way I managed to blew out LocoNet communication on the SRC16 controlling the Talheim panel.
That's it. I'm going to put all the accessory and feedback decoders on a standalone LocoNet bus, while only devices required to control trains will remain on the LocoNet bus attached to the Intellibox, i.e. the LocoBufferUSB and a UP5 panel. The idea is to electrically isolate this bus from the Intellibox to protect it from the unusual reference voltage setup used by this command station.
For the stand-alone bus, a LocoBufferUSB needs to provide the Master termination, and the RailSync lines need to be powered by 12V DC. There are several ways to do this. I'll try to learn more about this over the coming week.
Along the way I managed to blew out LocoNet communication on the SRC16 controlling the Talheim panel.
That's it. I'm going to put all the accessory and feedback decoders on a standalone LocoNet bus, while only devices required to control trains will remain on the LocoNet bus attached to the Intellibox, i.e. the LocoBufferUSB and a UP5 panel. The idea is to electrically isolate this bus from the Intellibox to protect it from the unusual reference voltage setup used by this command station.
For the stand-alone bus, a LocoBufferUSB needs to provide the Master termination, and the RailSync lines need to be powered by 12V DC. There are several ways to do this. I'll try to learn more about this over the coming week.
Thursday, October 25, 2012
Wednesday, October 24, 2012
JMRI BackAndForth.py
Most underground tracks are hooked up to occupancy detectors. I'm cleaning track and one of the easier ways to distribute the cleaning alcohol is to run a train back and forth over the cleaned section. But that gets old pretty quickly, so I modified JMRI's BackAndForth.py sample script and made a locomotive run through staging tracks controlled by a script.
This presents the first time that I dabbled in automated train control on my layout. So many possibilities ....
The video shows a trip of the locomotive through staging as seen on the main panel of the Welztalbahn.
Tuesday, October 23, 2012
Sunday, October 21, 2012
New Emsingen Panel
The new panel for Emsingen is built and functional. All powered switches in Emsingen can now be controlled using the same logic I deployed in Talheim, along with routes and appropriate semaphore signaling.
The red buttons control routes and semaphores. The logic works by first pressing the button FROM where the train is coming, then the button TO where the train is going. The computer/JMRI take care of throwing the right turnouts and set the appropriate signals, including speed signaling for diverging vs. straight routes. The black buttons control the turnout at the respective location.
The story here goes that turnouts with black buttons are hand-thrown by the switching crew, while turnouts off the mainline are thrown by the tower operator.
The red buttons on the yard ladder line the yard turnouts so that the respective yard track can be reached from the switch lead.
I have not yet put together the indicator LEDs for the mainline turnouts and various control indicators. I'll do that for the Talheim panel first, Emsingen next, and finally the various turnouts in staging.
The fascia still needs some paint. Another day... I haven't run trains in a while, so the tracks in staging are all gunked up in various places and need some thorough cleaning.
The red buttons control routes and semaphores. The logic works by first pressing the button FROM where the train is coming, then the button TO where the train is going. The computer/JMRI take care of throwing the right turnouts and set the appropriate signals, including speed signaling for diverging vs. straight routes. The black buttons control the turnout at the respective location.
The story here goes that turnouts with black buttons are hand-thrown by the switching crew, while turnouts off the mainline are thrown by the tower operator.
The red buttons on the yard ladder line the yard turnouts so that the respective yard track can be reached from the switch lead.
I have not yet put together the indicator LEDs for the mainline turnouts and various control indicators. I'll do that for the Talheim panel first, Emsingen next, and finally the various turnouts in staging.
The fascia still needs some paint. Another day... I haven't run trains in a while, so the tracks in staging are all gunked up in various places and need some thorough cleaning.
Sunday, October 14, 2012
Another house for Emsingen
I'm putting together yet another Faller kit to add more houses to Emsingen. In this kit I'm trying out a trick to get more depth behind the windows by adding a 0.20x0.60" styrene strip on the inside to keep the paper mask a whee bit away from the window glass.
![]() |
| House with the styrene strips behind on the inside of the windows |
Franziska wanted to have a flower shop in the house instead of the bar that comes with the kit. I re-decorated the shadow box behind the big window with some foam flock... Well, ... at least it's clearly no longer a bar. I'll add a canope for "Franziskas Blumenlaedle" later.
![]() |
| Window shopping |
Wednesday, October 10, 2012
oh yeah, I can see it now ...
Monday, October 08, 2012
Fascia fix-it
The fascia at Emsingen was one of the first I hung when I decided to keep the "operating pit". Since then I learned a few things, such as how to cut holes in an installed fascia without scratching the surface (use blue painter's tape), or to check for things that are behind the fascia (turnout motors, layout supports) before cutting a hole...
Either way, I moved the UP-5 out of the way of the turnout motor a few months ago, and now that it's time to upgrade the control panel for Emsingen, I might as well put it in a spot that is more convenient to reach. Since most operators have problems seeing the panel with the somewhat tight space in the operating pit, I wanted to install the new panel slightly tilted, so that the button and track arrangement is more visible. We'll see how well that works out...
Either way, I moved the UP-5 out of the way of the turnout motor a few months ago, and now that it's time to upgrade the control panel for Emsingen, I might as well put it in a spot that is more convenient to reach. Since most operators have problems seeing the panel with the somewhat tight space in the operating pit, I wanted to install the new panel slightly tilted, so that the button and track arrangement is more visible. We'll see how well that works out...
![]() |
| New fascia board installed. The UP-5 is now mounted on the L-girder supporting the layout. |
![]() |
| Testing view lines with the old panel. I can barely see the uppermost buttons when I'm standing straight, but the new tilted arrangement is much easier on the eyes for anyone shorter than me. |
Scenery update
I promised removal of the ugly distant hills behind Hinteraecker in my last post on this subject. Here is the result.
One of the items in my luggage on the return trip from Zurich was Faller's "Rathaus Ahlsfeld" model, which is to become the centerpiece of the market square in Emsingen.
I need to get cooking on building more houses, as well as potentially get creative with background flats for the town.
![]() |
| Hinteraecker background |
![]() |
| Emsingen |
Tuesday, October 02, 2012
Monday, October 01, 2012
Friday, September 14, 2012
Uetliberg Hike
The team went up to Uetliberg tonight. While we intentionally chose the longer path, trying to avoid the super steep direct route, it took longer and was steeper than expected. Nevertheless, this time nobody got lost, and we had a nice dinner at the top of Zuerich.
![]() |
| View from the path through the forest towards Zurich |
![]() |
| Tomorrow will be taking the train in this direction, and go visit some real mountains. |
Sunset Cruise on Lake Zurich
ZSG's sunset cruise is a two hour trip on Lake Zurich to Rapperswil. ... and another two hours back, if you indeed feel like taking the boat.
![]() |
| It took two hours for the sun to set, and a lot of photos... |
![]() |
| Sunset dinner |
![]() |
| And now we are reaching the light sensitivity boundaries of the sensor in my cell phone camera. At the lake in Rapperswil, just below the castle. |
Wednesday, September 12, 2012
When there's rain, there's water ...
The Sihl, one of the two rivers flowing through Zurich, is usually only a few inches deep, and cristal clear. However, after the rains last night, it's carrying a lot more water, and one can't see the river floor anymore.
Sunday, September 09, 2012
Swiss ingenuity
What do you do if there's not enough space to build a freeway into the city?
...
You put it over the river:
A little bit downriver they put a train tunnel underneath the same river. Bahnhof Selnau, the underground station in that segment, is accessed from a bridge crossing the river.
View Larger Map
...
You put it over the river:
![]() |
| A3 on top of Sihl river |
A little bit downriver they put a train tunnel underneath the same river. Bahnhof Selnau, the underground station in that segment, is accessed from a bridge crossing the river.
View Larger Map
Subscribe to:
Posts (Atom)


























