Showing posts with label svl. Show all posts
Showing posts with label svl. Show all posts

Friday, August 27, 2021

SVL: August Modern Ops Session

For the first time in months, I was able to participate in an ops session at Silicon Valley Lines in person again. This was a nice opportunity to catch up with other club members and enjoy the atmosphere of being in the layout room. I ran Bayshore Yard, which was a very relaxed assignment with plenty of opportunities to railfan trains run by remote operators.


Saturday, May 22, 2021

NMRAx: "Remote Operations at Silicon Valley Lines"

 

Dave Falkenburg and I gave a talk about remote operations at Silicon Valley Lines as part of the NMRAx clinic virtual convention program. The edited version of the talk has now been uploaded to Youtube. I'm very happy with what we at Silicon Valley Lines have managed to build here, and how the concept of remote operations is gaining traction, likely to stay with us as part of the "new normal" post-COVID.

Saturday, March 27, 2021

SVL: March Ops

CabCams tested and ready to go

With Santa Clara County back in Red Tier we started to plan for an end of the month remote ops session. This week the county upgraded to Orange Tier and California announced availability of vaccinations for everyone in April, so things are definitely improving with regard to the pandemic.

This month's Ops was for club members, and became sort of a shake-down session. The layout hadn't run since the November Open House, and we wanted to try out using Zello Personal instead of FRS radios to facilitate remote operator communications with Dispatch and Yards, including the ability to have multiple sub-channels for focused communication.

Extra 200 is staged in Dodge Siding for a trip to Tracy

Somewhat to my surprise, we had a lot of problems with Zello. The app is very slick, and easy to use. It does project the feeling of being on a radio link, which I think adds to the realism of communication.

However, multiple participants reported problems with a significant delay of the microphone going live, as well as being throttled by Zello for sending too many messages. It's not a good situation when the dispatcher can't talk to the rest of the crew because Zello determined that he has been too active and repeatedly puts him into a "timeout box" for two minutes.

I spent a good part of the evening jumpstarting the session. When the crew settled into a rhythm and the session was running, I got to run train 443, which required a local operator due to the large amount of switching needed in Nowheres and Silicon. After being in a session facilitator role for most of last year, it was very nice to again run a train on the layout.

Train 443 (in the front) has suspended switching in Silicon to let Extra 200 pass. X200 is controlled by a club member in the UK.

With switching chores in Silicon completed, train 443 continues to Windsor

Overall, this was a good, but somewhat chaotic return to operating our layout. There is a Youtube Live recording with sound from the dispatcher channel which might be enjoyable to some of my readers.

Monday, March 22, 2021

Published. Again. (2)

Part Two of the article series Jeff and I wrote for Roundhouse, the magazine of the NMRA British Region, was been published recently, and today our printed copy arrived.

Part Two focuses on the practical aspects of setting up and running the November 2020 Virtual Open House at Silicon Valley Lines. The technical setup, practical considerations for tools and software, as well as ensuring a positive visitor experience.

Hopefully, we'll be able to offer a similar event to a global audience very soon.

Saturday, March 13, 2021

SVL: Upgrade Orgy

I spent most of the day today at Silicon Valley Lines tending to deferred computer maintenance. I upgraded the computer running DecoderPro at the programming track, and the layout computer to Catalina which is the latest version of MacOS X that will run on these somewhat old machines. Downloading OS versions, installing them, and applying point updates took a loooong time. Once the OS was updated, I double-checked the JMRI installation. I needed updated drivers for the USB to serial converters built into the NCE USB interface and the LCCBuffer USB, but that was easily accomplished, once I figured out which exact drivers I needed. I upgraded JMRI to version 4.22 on both computers through a couple intermediate steps at 4.12, 4.18, and 4.20 as recommended in the release notes. The upgrade process itself -- while boring -- went off mostly without problems. 

JMRI changed behavior in the JSON interface with regards to notifications around version 4.15, which breaks the integration of the custom web panels we use for controlling the layout. We'll need to dig a bit deeper to understand how to fix that. This problem was the main reason the layout computer was still running JMRI 4.14 so we have known about this problem for a while. It's time for a fix.

While the computers were downloading and updating stuff, I filled out the submission paperwork for inspection of the cars I built, decaled, and weathered over the last year. I also measured wifi signal quality around the layout room to help with investigations to improve quality of our cab cams.

Overall, a productive day, even though it doesn't feel like it.

Update 2021/03/14:
We've traced the change in behavior to JMRI being more strict about JSON requests and requiring a method field in the JSON data our panels send to the server.

RSD5: On the layout


My two RSD-5 lettered for Silicon Valley Lines numbers 1665 and 1667 moved to the layout tonight. After unpacking I couldn't resist taking them for a short trip from Hallelujah to Bayshore and back. Here's the pair rounding the curve at the Bayshore shops. As I was running the train I noticed that I forgot to clean the wheels after weathering, so power pickup was ... variable. 


On the way back to Hallelujah I caught the train at the bridge in Escape. The first batch of decaled and weathered two-bay hoppers looks very nice as the wheels are pounding the bridge decks.



Sunday, January 24, 2021

SVL: 2-Bay Hoppers for Ashgrove (2)


I'm done with the first batch of the 2-bay hoppers I'm preparing for servicing the Ashgrove quarry in Jacksonville on the Silicon Valley Lines. After painting and basic weathering the cars over the last couple weeks, today all cars got their matte varnish coat while I was watching the tsg multimedia Layout Design Panel Discussion.

Here are all 9 cars staged on the Welztalbahn. While it was a lot of fun giving a bunch of very similar cars a unique personality each, and I still have another 9 cars to work on, I'm now going to pivot back to the Untergröningen module. A couple orders have arrived, so I can continue working on kitbashing the locomotive shed and scratch-building the station building.

Friday, January 22, 2021

Published. Again.

The editor of Roundhouse, the NMRA magazine for the British Region, contacted us after the November Virtual Open House asking whether we'd be interested in writing an article about how Silicon Valley Lines does remote operations, as well as provide background on how we planned and executed the Virtual Open House in the middle of a pandemic.

Part 1 of the article I co-wrote with Jeff Rose covering remote operations is in the January/February issue. Part 2 covering the Virtual Open House will be in the next issue. This is my second in-print article.

I hope that in a couple months the pandemic situation will have improved enough that we would be able to hold remote operating sessions again. Maybe another Virtual Open House as a lead-in to the virtual NMRA 2021 conference this summer.

Sunday, January 17, 2021

SVL: 2-Bay Hoppers for Ashgrove

Two hoppers with basic weathering in the front. Several more unfinished in the background.

For the last few days, I've been working on a bunch of 2-bay hopper cars preparing and weathering them for gravel service at Silicon Valley Lines. Most cars are getting new numbers. Since I don't want to completely redo the numbers on more than a dozen cars, I'm just replacing the last couple digits with new decals. 

That doesn't go without some surprises. The digits for the replacement 25 are from Microscale 87-694, a decal set for Golden West Service box cars. Not a perfect match, but the decal color is very close to the existing print on the car. However, the decals are partially transparent. The yellow of the decal and the blue of the car body conspire to create the greenish tint visible in the photo. I'm going to try and tone down the difference with gravel dust during weathering.

Today I finished painting wheels and trucks. When doing multiple cars, it really helps to set up the work in assembly line fashion and keep working on the next car while parts for the previous car dry. Four to six cars seems to be a good batch size when painting. 

For weathering with PanPastels, I can do two cars in a row before I want to work on something else. Hence I have a few other projects ready to go on the workbench as a diversion.


[ part 2 ]

Tuesday, January 12, 2021

RSD5: Weathering

The two Atlas RSD5 in Silicon Valley Lines livery are now ready and will move to the club for final testing when the county Stay-At-Home health orders have been lifted.

After applying the SVL decals last September the locomotives sat on my workbench and didn't get any attention until early December. I started with making the units a bit dirty and applied a wash of rail tie brown. It dried much lighter than I had expected. Urrgh.

I attempted to fix the ugliness with various applications of PanPastels. I really like the versatility of PanPastels. Once I was happy with the effect, I sprayed the locomotives with Dullcote and all the weathering turned into barely visible dark shades of green and yellow. Ah right I remembered: Dullcote needs to be at room temperature, applied from more than a foot away, and only in short bursts. The idea is to not get the PanPastels wet, and the Dullcote drops land on the pastels almost dry. For me the locomotive was dripping wet. The neighbors likely heard me swearing, but were nice enough not to say anything.

The second try of weathering was a bit more sloppy, and I messed that up with Dullcote as well. Third time was a charme, and I let the engines sit for a while while I tended to other projects.

Finally, as I was weathering a bunch of freight cars with the airbrush recently, the RSD5's received some more dirt around the trucks, too, as well as a several very thin coats of Vallejo Matte Varnish.

To finish off, I carefully applied Vallejo Dark Grey wash to the rear wall of the cooling grills, which adds to the illusion that you'd look into the dark air-cooling chamber at the locomotive front. Had I used light grey with the yellow sides, the effect would have been more subtle, but it's workable, so I left it as is.

In any case, I'm happy with the overall appearance. The weathering is subtle and not totally in your face. The Vallejo Matte Varnish works well, if only it would not be such a pain to clean the airbrush afterwards. The lead photo shows both completed engines staged on the Welztalbahn. I can't wait to run them at SVL.

Saturday, December 12, 2020

Published

 
The December 2020 issue of the NMRA Magazine features an article about Silicon Valley Lines which is my first published print article. Dan Munson shot fantastic photos of the layout last August. Creating this 9-page feature was a lot of work, made easier with the help from a lot of people. It's really a milestone for the club to be represented in print and I'm proud of what we have accomplished. A big thank you to all that made this feature possible.

Friday, November 27, 2020

Accurail #80792 Wescott & Winks 40' Wood Reefer

I purchased this Accurail kit several years ago on another business trip that included a stop a Eastside Trains in Kirkland, WA. There were several versions of this wood reefer on the shelf, decorated mostly for PFE, MDT, and other well-known carriers. I didn't want to renumber the car, so I got one I knew wasn't on the club layout. 

Here's the car body straight out of the box.

I started with the underframe and applied washes of rust, dirt, and railroad tie brown. I generally just dip the brush into the color, and thin the color in a drop or two of water. That's enough for one pass. While the blotches of color and brush marks look quite terrible at first, after several applications, the blotches combine to translucent layers and create a very nice and natural color effect. At the very end, I apply a thin dusting of Pan Pastels Raw Umber Shade to pull everything together.


For the metal roof I started with a wash of light rust, focused on the ribs and crevices. When that was dry, I cut off the molded grab irons and stirrup steps and replaced them with painted Tichy grab irons (I need a finer drill for smaller holes...)

I left the molded ladders intact, because the replacement ladders I have are very finicky to deal with and seem too fragile for an operating car.


I followed the rust wash on the roof with several layers of Pan Pastels Burnt Sienna and Raw Umber shades. I toned down the car sides a bit with a Pan Pastels white shade and a light dusting and streaks of dirt still on my small deer foot brush. I'm very pleased with the overall result.


I did make a big mistake and while dusting the car side hit a spot I had painted white earlier. The pigments stuck to the slightly tacky paint clearly bringing out the outline of the paint. I made it worse by dabbing over the spot, and ended up with a nice round dark splotch on the white car side. After that I called it a day yesterday evening, and let the car sit overnight.

Today I tried fixing the blob, scratched off some of the paint and pigments, and tried to hide the mistake with white shade and dirt. This created some white splotches on the roof, which I thankfully could mostly wipe off. I could not fix my mistake 100% without having to start over on the car, but at least it's not an ugly round splotch anymore. 


I still need to add a tiny dab of paint to hide the oversized drill holes.

Wednesday, November 25, 2020

Accurail #5129 50' plug-door BN/RBWX box car

RBWX 79248 painted and weathered, but I skipped all further detailing
I've never built an Accurail car before. Why would I want to build a car if there are many finely detailed ready-to-run cars available? And why build one that won't even run on my railroad?


I picked up this kit on a business trip last year -- in the olden days before the pandemic -- along with the Bowser cars I wrote about before. The club requires metal wheel sets, so I ordered Intermountain wheel sets to replace the plastic wheel sets that came with the kit, and I should replace the plastic couplers with the respective Kadee couplers (looks like #148 is the right one). 


The car body is preformed, and the plug door needs to be installed. I wanted to the body to be closed, because otherwise I'd need to find a solution for hiding the weight that runs the length of the car. I popped off the roof walk when I toyed around with the kit in February and haven't touched the kit since. It bothered me that the roof walk is the same color as the car body, so I decided to paint it aluminum and tone down the sheen with a dirt wash afterwards.

I painted the trucks, wheels, and axles in rail tie brown, which is a nice undecipherable dark dirt color, and  applied a wash to the trucks to accentuate the details a bit more. The floor underside got a brown wash over the black molded plastic. I don't usually look under my cars, so I did this mostly to break the black plastic sheen.


I found a color photo of a ... reused ... RBWX box car and noticed that the ends are painted a brown-red commonly found on cars in reefer service. The Accurail car has the same yellow everywhere. I like the brown ends better, so I fixed that. The car numbers would need to be restenciled in white, but I'm not going to worry about that.



While I was applying a wash to the roofwalk, I also started dirtying up the roof. That didn't quite come out the way I imagined, but that's ok, the final weathering with Pan Pastels took care of that.


I used Neutral Grey extra dark to darken the roof, Burnt Sienna extra dark and Burnt Sienna Shade to set some rust highlights, and streaked these as mixture along the rivet lines on the sides. I used a make-up sponge and a fine brush to apply the Pan Pastels. Finally, I used deer foot brushes (medium and small) to tipple and brush the pigments around the car to create some variety of color shading.


I was after a slightly dirty look on the sides and a dirty, but well maintained roof. The sides got dirtier than I had planned, and the roof detail worked out differently than I imagined. However, I was happy with the look, so I sealed the paint job with Dullcote. The Pan Pastels thankfully don't react and disappear with Dullcote like the Bragdon powders do. Phew.

Weathering sealed with Dullcote.
So, why do all this? I eventually want an all weathered locomotive and freight car fleet on my own layout, so this is good practice and learning. I'm happy with the roof, not so happy with the sides, but that's ok. On to the next victim.

Saturday, November 14, 2020

SVL: Fall Open House

Remotely controlled train 4837 entering Kaos Jct on a green signal

The Silicon Valley Lines Fall Open House is in the box. I had a lot of fun, but as such events go, it was also stressful. The video-enabled Webthrottle worked well for remote visitors, once we got over a major mistake I made when sending the throttle URLs to the first visitor group.

After that I got more into a rhythm: Send emails with personalized throttle links to confirmed visitors, have them join on the video conference, give introduction talk, hand off to train master, and while the session is running work on the next batch of emails.

At the Audio/Video control stand preparing email notifications for the next session (Photo Credit : Josh)

We had planned for running a round-trip session every 20 minutes. That was a bit too aggressive, since it takes a train about 15 minutes to drive the Open House loop. We had pre-staged trains around the layout, so 3 visitors could start with running their train right away. However, 5 minutes was not enough to get operators on the video conference, familiarize them with the throttle control, and oriented on the layout.  Including an occasional break for the crew would have been nice, too. When we do this again, we should clock the departures on half hour increments, but otherwise can use the same process. 

I lost all audio output on the main computer controlling the Youtube Live stream for a while, and couldn't get the audio working again, so I substituted with a room microphone. However, audio quality on that microphone was very poor. Now -- with some distance -- I'm thinking I should have restarted the computer at the cost of dropping the live stream for a while. That would have been better than having the live stream with no usable audio.

Train 161 rounding the curve at Bayshore

The crew in the layout room was great. The cameras and the trains worked really well. The DSL connection held up well with only minimal drops affecting quality, even though we had the upstream bandwidth maxed out at times. 

We learned a lot during this Open House, which was probably the first time ever multiple remote operators ran trains on a club layout in parallel with individual video feedback. We have a long list of things we can improve on, but we'll get to that another time.

As we shut down the layout in the afternoon and closed up shop, everyone was tired, but happy. I got only positive feedback from visitors during and after their sessions. This was a long day, but totally worth it.

Wednesday, November 11, 2020

SVL: Rebuilding Camera 3

Back in September, as we were gearing up for another full-blown socially-distanced ops session at Silicon Valley Lines, I quickly needed to build another camera car. I had already built a supplementary power supply for James' Dash9 dummy locomotive using a well car and a 10,000 mAh USB power bank. I wanted a self-contained camera car, so I decided to build a cradle for the second power bank I had, and mount the camera on the side of the power bank. That setup became Cam3.

This worked, and we used the car in ops sessions since. However, over time it became obvious that for some reason this car had worse wifi reception than Cam4, my original camera design. That's very curious since it's basically the same hardware ... with two exceptions: Cam4 is powered with a JuiceBoxZero connected to a Li-Ion battery, and Cam3 hugs a big hunk of metal. Side by side comparisons showed that Cam3 performed clearly worse than Cam4, even after reducing the network data requirements of the video streams as can be seen in the SVL operator training video.

After acquiring a power bank in a smaller form factor, as well as a low-profile, right-angle Micro-USB plug I was ready to replace the first design for mounting Cam3. I decided to install the PiZero horizontally, but since the USB plug is sticking out quite a bit, I mounted the PiZero on a styrene sheet and built a support structure into the well car with the PiZero mount sticking out about 1/4" on both sides of the car.  I verified with an NMRA gauge that the wider platform is still within the loading gauge. Next I built a camera mount over the board and was very satisfied with my work. Here is Cam3 on the well car next to Cam4 ...

That satisfaction lasted for about 5 minutes, when I remembered that we have a couple signal masts in Jacksonville that are mounted between the tracks and clearly this arrangement is not going to fit.

It was time for design number three, which I call "The Fin".

I rotated the camera 90 degrees, so that it stands on its side. The angled Micro USB plug is now at the top and the USB cable threaded through the support structure.

I was careful to make sure that the camera is well behind the lead truck. I needed to rotate the camera image, which is easily accomplished by passing -rot 90 to mjpg_streamer. I'd still like to find an actual low-profile Micro-USB plug. There are some variants of what I'm thinking of available from Chinese suppliers (e.g. reasonably cheap on aliexpress.com, or very expensive on amazon.com), but they all have lead times of about 4 weeks and the plugs look very finicky and prone to failure. It's probably easier, and definitely cheaper, to just solder the charging leads directly to the PiZero.

In either case, now that I liberated Cam3 from the hunk of metal, it seems to performs much more smoothly.