I'm taking this week off from work to work on various projects in and around the house. Saturday morning was a lost cause, running errands and a 2 hour visit at the Home Depot, including getting carpet on order. Tuesday a guy will come out to measure it all out. I also picked up another set of shutters for the bedroom windows. Turns out that 68 inch (shutter width) is shorter than 70 inch (window opening). Gosh, where did I leave my glasses when measuring this? Sigh. I tried, and it does look a bit tacky if the blinds don't cover the full width of the window opening. I see another trip to Home Depot on the horizon.
At least I finished Patricia's workstation in the master bed room today, and organized all the moving boxes still stored in the garage (a lot of boxes). At least all the boxes are now accessible in case we need something.
The workstation is built into a closet. A small top shelf, a 1/2 inch laminated pine board accross the full width of the closet. I recycled the keyboard drawer from our IVAR shelving unit we had in the old place and mounted it under the new board. We don't have closet doors on most closet in the house anyways, and the Asbestos guys removed the rails from the ceiling as they scraped off the popcorn plaster before we moved in. With the new carpet the setup will look really nice. I've set up babybaer to connect via the wireless bridge for now until I run Ethernet throughout the house.
Finally, I removed lots of nails and screws from the walls downstairs and drained the spa, so we can clean it. Took only 3 hours, during which I moved the garden hose regularly, so all of the lawn gets some water.
No comments:
Post a Comment