Friday, December 27, 2013

Modifying the Timesaver

The office layout supports automated running. I want to be able to have two trains take turns on the single track section. That requires slight changes to the Timesaver side of the track. While at it, I'm fixing up minor issues with the existing tracks.
Tracks removed

Most replacement tracks are cut and the extra roadbed is glued down.
Waiting for the glue to dry. Time to bring the kids to bed...

No comments: