Saturday, December 12, 2015

German Holiday Market in Mountain View


The annual German Holiday Market in Mountain View is a fundraiser for the German International School of Silicon Valley.


All booths get false fronts to evoke the feeling of a real German Christmas market. Here's the booth of my favorite vendor.


Some evening shots after dusk. Great atmosphere and the crowd obviously was enjoying themselves, despite the long lines for food and drinks.


Thursday, December 10, 2015

Railroad Quiz on Spiegel Online

Spiegel Online had a railroad quiz today. The Quiz is in German, and covers geography and locations in Germany. Of course, I had to try it and got
Sie haben 9 von 10 Punkten.
Abgefahren! Sie kennen sich wirklich verdammt gut aus auf deutschen Schienen zwischen Nord und Süd und Ost und West. Uns würde es nicht wundern, wenn Sie auch ein Faible für Kursbücher hegen und heimlich Fahrpläne auswendig lernen.
 Rough translation:
You got 9 out of 10 points.

Great! You know German rails damn well between North and South and East and West. We wouldn't be surprised, if you'd like studying "Kursbuecher" (the complete schedules of German railways), and secretly memorize train schedules.
Hmmm in fact, I do like digging through my 1979 edition of the Kursbuch for Baden-Wuerttemberg, and I do know the schedule of passenger trains (Caltrain and Amtrak) through south San Jose by heart...

Caltrain


Riding in a Caltrain gallery-style car yesterday and today evoked memories from a job I had with a startup in South San Francisco, and the associated 2 hour one-way Caltrain + shuttle bus commute (door to door) between home and the office.

Wednesday, December 09, 2015

Evening


One last view of the Bay Bridge from the office, and off to the elevator to meet co-workers for dinner. Hey, look at that. Another display that crashed. Though I suspect this one has a bad disk, and thus doesn't manage to boot.


Food at the Slanted Door in the Ferry Building was excellent, and because the group was too big for our reservation we ended up sitting outside on the patio with a view of the Bay Bridge, and being able to hear each other...


Going to San Francisco


This morning I took the train to the city for a bunch of meetings, and walked to the office along the bay in light rain.


Sunday, December 06, 2015

260 417 working in Emsingen

Tonight I switched industries in Emsingen, as well as serviced one local freight that came through.

260 417 is pulling cars off the local freight on the northbound main.
Pull complete. Ready to reverse and shove the newly arrived cars into the yard for sorting.
Operator lubrication ...
260 417 just completed pushing the cars for Prechtal into the short tail track off Track 3 past Ef tower.
One more car ...
... and we are done.
The yard is now full with freight cars. Next, 260 417 will service the northbound local freight, and then put together the transfer run to Talheim.

Second Sunday of Advent


Saturday, December 05, 2015

747


We're cleared to take this 747-100 from SFO to Honolulu.

...

Fun at this year's work Christmas party at Hiller Aviation in San Carlos.

Thursday, December 03, 2015

Trans-Siberian Orchestra in San Jose



An early Christmas present from the best wife in the world brought us into the Shark Tank in San Jose for tonight's Trans-Siberian Orchestra show of "Ghosts of Christmas".

Once the show started, it took me a couple songs to adjust to the sensory overload emanating from the stage.


Given this is a sports arena, the sound was reasonably good. A nice back-story pulled the various TSO pieces together. As far as I can tell they played everything from "The Lost Christmas Eve", several pieces from "Beethoven's Last Night" and the "Christmas Attic", as well as several songs from their newer albums.


The stage show was beyond my wildest imaginations.
Multiple integrated huge video screens - check.
Computer-controlled light show - check.
Laser show - check.
Pyrotechnics - check.
Flame throwers (!) - check.
Movable trusses with musicians above the heads of the audience - check.


A Polar Express inspired train theme during one of the songs - check.


The concert lasted for over 2.5 hours and we had a very good time, hearing some excellent solo singers, rocking music that gets the juices flowing, and a flawlessly produced and (a bit over the top) choreographed show. A great start into the Christmas Holiday season.


Sunrise over Monterey Road


The storm is coming.

Wednesday, December 02, 2015

Puzzled


We're done. I guess, it's time to go back to model railroading.

Tuesday, December 01, 2015

More puzzle, less pieces


Getting there...
Franziska had quite some fun after I told her that at this stage you can pick almost any piece and find a place for it.

Monday, November 30, 2015

More puzzling


I never realized how relaxing it is to do a puzzle, and ... I never realized that I have the patience to sit over it for a few hours in the evening after a busy day and think while finding and placing the right pieces.

Sunday, November 29, 2015

Puzzling


Working on last year's Christmas puzzle.

First Sunday of Advent


Spending candle light quality time with family in the evening.

Thursday, November 26, 2015

Happy Thanksgiving!

Let's start with a naked bird...


... open it up, and stick it into the oven butterfly-style. A couple hours later ...



Yummy!


Tuesday, November 24, 2015

Emsingen Nebengebaeude scratchbuild

This is my first time, that I build a model completely from scratch, in this case styrene sheets and strips. While I'm really enjoying myself building this model, I can see why people that scratchbuild regularly have a stash of doors and windows. They take forever to build yourself and the result is at best acceptable, unless you are really good (not me), or going for the shabby look with odd angles and pieces that barely hold together.

Anyways, ... here's how far I got since yesterday:


Using paper cutouts from the prototype as a guide, I cut the inside walls from styrene sheet, ...


... and glued them to a box. This is a sturdy base for gluing the outer walls and building doors and windows.


I started with the rear wall, which has only one door, to make the inevitable mistakes face the backdrop, instead of laughing into my face every time I turn on the light in the layout room.

Sure enough, the one-piece v-groove siding below didn't survive in one piece because I managed to cut the door opening several millimeters too large. Measure twice, cut once. Yeah, yeah, I know...


I use basswood strips for the foundation, since these strips are a tiny bit thicker than the styrene siding, giving the foundation a bit more heft. The door is made from various width of 0.010" Evergreen strip styrene (0.080" for the kickboard at the bottom, 0.060" for the door panels, and 0.040" for the groove pattern below the window). The door frame is made from 0.040" x 0.060" strips.    


The other reason I cut the siding in multiple pieces is the horizontal board (0.030" x 0.040" strip) that sits between the door and the skylights just below the roof. By the way, this is the door to the ladies restroom. This is state I left it at late yesterday evening.

Today, confident that I have an idea what I'm doing I started with the front wall. Two doors. One window. Cutting and fitting the siding was straight-forward.


The window was hard. I quickly gave up on the idea of building window sashes and instead dug through the left-overs box to find a window that's close to what I needed. The selection was thin, but I found one window frame that would work if I removed most of the window and just use the interior to get the 6 glass panes I wanted. Now I just needed to cut a clean hole into the inside walls ...

After lots of swearing, tooth gnashing, and generous application of drills, knifes, and a square jeweler's file, the window was set in place.


By now I have the process down for making doors. The NWSL Chopper yet again proofed its worth for making exact length, square cuts, and cuts at 45 degree angles. Here's the completed front wall. The door on the left leads to the wood storage room. The door in the middle accesses the train lamps storage and work shop. The worker even gets some daylight through our shiny new window. The skylight on the right is for the men's urinals.


Here's the blank canvas of the last wall. I already glued the foundation strip in place. A while after I took the photo I noticed that I glued it on backwards and the door is now on the wrong side of the center line, and we'd walk straight into the men's toilet, instead of the room with the urinals.
Oh well, had I not told you, you wouldn't have noticed, right?


The lower siding and the door frame are glued in place and and the upper siding is ready for cutting the skylights to the urinals. Yep, in addition to their toilet, the gentlemen get space for urinals that is at least three times the size of the single toilet room the ladies have. AND, they get 4(!) fancy-shmancy skylights.

I guess around 1900 more men worked on and traveled by rail so the imbalance maybe even makes sense.


Alright, it's late enough. I won't finish the last wall today, but here's a quick peek at what the raw, unfinished building looks like on the layout.


Friday, November 20, 2015

Emsingen Nebengebaeude prototyping

The main station building in Emsingen, based on a prototype building in Trossingen, is rather ornate and fancy. I've kit-bashed the shed on the northside of the station building, and I've been on the lookout for a bland outbuilding ("Nebengebaeude") that would contain restrooms as well as a couple storage rooms for lamps and heating wood. Since I model the Black Forest area, I wanted the building to have a typical Wuerttemberg look. One version of Faller's excellent "Gueglingen" station kit comes with such an outbuilding, but I didn't have a good example to work from.


While searching the Google for plans, photos, footprints, etc. for such building I came across Godwin T. Petermann's site on cardboard modelling. Godwin did ten years ago what I'm still planning to do: Go to the Staatsarchiv in Ludwigsburg and look up the original building plans. What's really cool is that he made various cardboard models from what he found in the archives. The Dettingen building on the web site is quite similar to what I had in mind. Even better, the site has a simplified version of the anxiliary building in Endingen for download, so I printed that, and a few minutes later, a paper outbuilding went up next to the station building.


Errrrm, ... yeah, that's too big. Back to the printer, try again, and build a shortened version that only has the urinals, toilets, and two small storage rooms. There is a floor plan on the gtp Web site, which makes it easy to see the purpose of each door.


Much better. It fits well in the space I have for it, and goes with the flow of the station area. This looks like a viable option with the right dimensions to use as basis for scratch-building a region-appropriate, believable outbuilding. Let's see how that goes...


Thursday, November 12, 2015

Shed Floor and Track Ballasting



The area between mainline, gardens, and backdrop is pretty much taken care of now. In the last couple days I built the floor of the Koef shed and ballasted the tracks in the vicinity.


I used cork to raise the shed floor to the height of the track ties inside the shed, and covered them on the outside with styrene sheet. Between the rails I used Evergreen 0.010 x 0.150 styrene strips to cover the gap between rails and the stud contacts. For the gaps between the stud contacts I cut Evergreen 0.010 x 0.040 styrene strips to length with the NWSL Chopper, which allowed quick and accurate production of enough pieces.  The sheets were glued in place with wood glue. Between the rails I used plastic cement. The 0.040 strips are a little bit too thin to match the stud width, but the gap is easily filled with some white glue and paint.


The bright white styrene was painted with Pollyscale Concrete, and later weathered with powdered pigments to create an oiled and dirty effect. I also filled the "under-concrete" gaps between the ties in the floor area with fine ballast. It would probably have been better to use another styrene strip to hide the gap and the rail mounting hardware.


Like in Emsingen I used Woodland Scenics brown medium ballast for the side-tracks and aimed for the "not so well maintained" look here as well. Below is a comparison shot of the Welztalbahn mainline on the left with nicely built up ballast, a ballasted side-track in the middle, and the unballasted track I started with on the right.


One last detail shot below. I need to do another pass and weather the track with a mixture from thinned acrylics to blend the colors together and get rid of the plastic sheen on the ties. I will likely do that only when I have either ballasted Talheim station to the left, or the industry tracks to the right of this scene, and have a large area to mess with.