The big layout of my childhood no longer exists. Here's how things went down...
Tuesday: 2h, most of catenary.
Wednesday: 2h, more catenary, the first sections of track on the upper level.
Thursday: 3h, bridge, most of the upper level, start with freight area.
Friday: 5h, ramps, main station, rest of freight area and remaining visible track.
Saturday: 3h, dismantle mountain to get to the tunnel tracks, remove tunnel tracks;
4h, box all material, and clean out parts from base plywood.
Sunday: 1h, removing cables from the underside of the layout
16 working hours to take this layout apart cleanly, and pack away salvageable pieces. The saying is true, it's much easier to destroy than to build...
Left to do is cleaning out some more of the electrical from the underside of the layout, as well as removing some control switch boxes for a temporary setup back home.