The things that need to get done ...
Master Bedroom:
- paint all walls and baseboards
- oil wardrobe
- new carpet
- set up wardrobe
- build Patricia's computer corner
- 2x RJ45 100BaseT network drop
Living Room:
- reduce count of boxes to zero
- paint all walls and baseboards
- find and set up new closet for games
- 2x RJ45 100BaseT network drop
Hallway:
- paint all walls and baseboards
- set up book shelf
Family Room:
- paint all walls and baseboards
Kitchen:
- paint all walls
- paint cabinets and cabinet doors
Upstairs hallway:
- paint all walls and baseboards
Trainroom:
- remove existing shelfing
- paint all walls and baseboards
Garage:
- reduce count of boxes to minimum
- make washer operational with hot water
- install 240V/30A outlet for dryer
- buy and clothes dryer
- set up computer rack
- communications:
- DSL splitter in demarc box
- set up structured wiring center
- route phone/network lines through wiring center
Garden/Outside:
- make spa operational
- review outside lighting
- check sprinkler control panel
- solar PV system installation