Saturday, August 31, 2019

Untergroeningen: Progress


Today I finished up track and wiring for segments 1 and 2 of Untergroeningen. The dining table makes for a convenient work surface for the two segments, so that I can properly align the Raiffeisen track at the segment boundary. When I had it spiked almost all the way to the end, this is what the end of track looked. Huh. Why is the end of track so crooked?


Oh! Because the end of track is at the segment boundary. Sigh. This looks terrible. What was I thinking?


I pulled all the spikes, turned the track around and spiked it a second time. Much better now.


Untergroeningen Segment 1 is ready for testing.


I spent the rest of the day with installing switch machines and finish track wiring segment 2.

No comments: