Saturday, June 08, 2019

Annweiler'19 Fremo-Puko meet


While Maerklin-compatible modular arrangements have been around for quite some time, over the last few years a group formed with the goal of bringing Fremo-style operations to 3-rail modular arrangements. Based on the Fremo HO norm, the Fremo-Puko norm was finalized in 2013 with many recommendations and a minimal set of requirements. (This Stummiforum thread gives a nice overview). I have been experimenting with Fremo-Puko modules so when I heard that there was going to be a meet of like-minded people in Annweiler am Trifels, I made arrangements to be there.

The event took place in the gym of the local elementary school, with more than enough space for the module arrangement. The modules were a mix of MIST55 and Fremo-Puko modules.



One of the operational center points of the arrangement was the terminal station Ramstein where I had the pleasure to run the station switcher for a while. I also ran the yard switcher in nearby Pfaffwerk during another session. The schedule was sufficiently complex to keep operators on their toes. A busy double-track mainline ran from Ramstein to Nord Staging. There was also a branch line connecting to Quetschebach.


Going to modular meets is a fantastic way to get to know more people with similar interests and I always find new ideas and inspiration. A good example is the row of houses in the front of above photo. They are set on the edge of the module with only the sidewalk before the "abyss". The lively scenes modeled here combined with the grey of the module sides make you forget that the road is not modeled at all.



The rear of the houses evokes the feeling of drab backyards facing the tracks that is so common around the prototype. Despite all this layering the scene doesn't consume much space.



Ramstein has five passenger tracks with an additional module under construction that will expand the station to 8 tracks.


There is a large engine facility next to the passenger station with full service facilities for steam and diesel locomotives. Rarely do model railroads show properly sized coal bunkers like this.


Behind the Betriebswerk is the central part of town.


Pfaffwerk is a rather large industry kit-bashed from several boxes of the well-known Kibri kit. However, the real fun part of this module is the hump yard on the opposite side of track used for classifying cars. While we didn't use the large hump and had to give the freight cars a light push, humping cars with the switcher set at speed step 1 felt quite right and was fun.


The Schwarzenberg modules with the narrow-gauge "Lorenbahn" are very nicely done and come with  maerklinized Code 83 Weinert track. The narrow gauge is operational and a joy to watch as it slowly makes its way from the loading area to the ore mine and back.



A confirmation that very high quality modeling with good-looking track is achievable with pukos, too.


Another module I've been following on Stummiforum not only has beautiful track work and effective scenery, but is tricked out with invisible optional mounting positions for catenary masts and a signal mast.


The masts are built into an aluminum U-profile and slide into another profile that's mounted inside the module.


Here's the module with the catenary masts popped into place. "That's where the mounting position for the signal mast is located."


Otterbach station has the generously spacious rural look and feel I'm after for my rendition of Gaildorf/West. Very inspirational to see this.



Awanst Niederweilbach is another module I've seen online before seeing it in person here. Clearly exceeding expectations. The gravel is loaded for real, so engineers better don't have an accident with that train.


Overall, a fun weekend in super-friendly company. This time I was able to stay until the end and help with teardown. It's fascinating to see how within a couple hours a large layout turns into boxes and crates that are rolled out of the gym to waiting cars and trailers.




Waiblingen - Annweiler am Trifels


Starting off to a hopefully fun weekend with lots of trains, I take RE 19416 from Waiblingen to Stuttgart Hbf. Today is the last day of the Winterfahrplan. The operator of this RegionalExpress line will change from DBRegio to GoAhead tomorrow. When the conductor made the arrival announcement at Stuttgart Hbf one could hear this was quite an emotional trip for him.


I had some time, so I walked towards the end of the platform at track 12 and took photos of BR111, the last DB main line electric locomotive series built in Einheitslok-Design with conventional electric motors and still one of my favorite locomotives. Following classes (BR120 and later) utilized three-phase motors and modern chassis designs.



I hear one of the other waiting passengers groan and swear. IC 2164 is now shown as 20 minutes delayed. Sure, why should I not get to enjoy the current Deutsche Bahn? I use the opportunity to take more photos.


More groans a few minutes later. The online BahnApp shows it first, and the platform sign confirms a couple minutes later: IC 2164 to Karlsruhe is canceled, due to "technical problems with the train".


The BahnApp recommends taking IRE 19030 to Karlsruhe Hbf, departure 9:00am for my ticketed trip. However, I had noticed earlier that there's an InterCity leaving from track 9 at 8:42am. Even when I searched for Stuttgart - Karlsruhe only, the App insists on putting me on the IRE. I stroll over to an information person and he confirms I can take the InterCity.  I'm not the only one and I see several faces, families, and small groups that were waiting with me at track 11 before.


5 minutes before arrival, an announcement is made that IC 2266 is leaving from track 8 today. More groans... Here is 101 090 pulling IC 2266 into Stuttgart Hbf track 8.


 40 minutes later I disembark in the station hall at Karlsruhe Hbf.


Since I had a spare half hour I, once again, wandered towards the end of the platform to see if there was something interesting going on. While there was not much train traffic in Karlsruhe, I had noticed an unusual color scheme on the lead locomotive of my Intercity.


Indeed it's a BR101 in "Rheingold" design, a Marketing gag of Die Wilde 13 plus, a German dealer collaboration. Of course, they are selling the respective model, too. A neat idea to create limited edition models, but not really my thing.


For the rest of the trip to Annweiler, DB runs DMUs from Karlsruhe to Landau Hbf where I change trains right across the platform, but no time for a photo.


Arrival in Annweiler am Trifels with one hour delay. Oh well, not a big deal. At least trains run every hour here...

Thursday, June 06, 2019

Wednesday, June 05, 2019

SFO - FRA - STR


The new observation terrace at the end of terminal G at SFO is quite nice and provides a nice view of the airport. Yes, it's very bright out here.


That extra fun is needed, since my flight is 70 minutes delayed. I'm not convinced I will make the connection in Frankfurt. Let's see how that works out ...

10 1/2 hours later we docked at Z gates in Frankfurt. It is 10 minutes to boarding for my connecting flight. I already made peace with the fact that I will miss this connection and mentally prepared for walking over to the transfer desk to pick up the boarding pass for a later flight.


To my surprise, Lufthansa had arranged for Ramp Direct Service (RDS) for the flights to Lyon, Basel, and Stuttgart, which means a crew of super-helpful Lufthansa employees collected everyone on these connecting flights right at the arrival gate and put us on a bus.


We got ferried to another terminal, disembarked, walked through a dedicated area to handle immigration where it appears two officers were sitting there just for such groups. Then re-embark on the bus, drive around the terminal and unload the Lyon passengers next to another bus that will take them to their flight.


The rest of the group continued on. We were driven to an outfield position where the Regional Jet to Stuttgart was being prepared for departure. Us two Stuttgart passengers hopped off and the RDS bus drove off with the remaining passengers to drop them with the Basel flight. A great experience and super-effective.


The flight from Frankfurt to Stuttgart is a mere 25 minutes, even less in the air. I made the flight, but my luggage did not. 


Back home for a couple days. The lady at the baggage desk was super-friendly, and the bag is supposed to show up later tonight.


Update 2019/06/06:
The bag showed up the next day and nothing was broken. Yay!


Sunday, June 02, 2019

Streckenende: Storage Box


I built a simple storage box for the Streckenende module. The idea is to use this both as a storage box, but also for transport. The box is constructeed from hardboard and plywood strips.


The bolts and wing nuts hold the module in place, and provide stability.


The box simply sits over the module


Unscrew the bolts and it slides out. If I have enough space in my luggage, the module will travel with me to Germany this week.


Saturday, June 01, 2019

SVL May Operations Session


Today's operating session at Silicon Valley Lines was set in the modern era. I ran a variety of trains, including 320, 236, and more. A very enjoyable way to spend a few hours on a Saturday.