Saturday, September 06, 2014

Coaling facility mock-up


The coaling crane got put on its pedestal tonight. I also cut and spray-painted the concrete floor of the coaling area. The service track looks funny with concrete on one side and ties under the rails and the other side, so I will probably cover that up as well. The color of the spray paint is not a perfect match with the concrete color I used between the rails, but I expect that by the time I'm done with dirtying everything up, the difference will be negligible.


The second photo shows the area that will become the coal storage bunker. So far, so good.

No comments: