I'm using the opportunity that there is space in the garage to set up the Untergroeningen branch of the Welztalbahn. Today was the first time that I set up Slim Staging with the backdrop and the turnout control panel connected to the module.
The Welztalbahn hasn't run for almost a year and the modular extension so far hasn't run in operations at all. The track cleaning train has some work to do ...
No comments:
Post a Comment