Saturday, June 13, 2015

"La ponctualité, notre priorité"

View north somewhere south of Iceland
Boarding for AF83 was delayed by 20 minutes today. Once we were on the plane nothing happened for another 20 minutes or so. Then the announcement: "There is a problem with the brake system. We're working on it. Please be patient."

...

After an hour they gave us the option to leave the plane as required by US government regulations. I think that's part of the passenger bill of rights. Of course, if you leave the plane, you need to take all your belongings and if you're not back in time when the doors close, tough luck.

...

A little while later they announced that they will turn off power for 10 minutes. In other words, they rebooted the plane. Very comforting. One of the stewardesses later explained that there was a maintenance done in Paris before the inbond flight to SFO, that changed a bunch of passwords, and a component of the secondary brake system that was worked on in San Francisco, did not come back online in that system environment. "The Airbus 380 is a modern, computerized plane, and just like modern cars with all their computers have problems all the time, so does this plane", she said. Oooooh, that's comforting.

...

Once that was done, everything was working properly. Yay!
However, we sat at the gate for another 30 minutes or so, because one passenger indeed left the plane and didn't reboard, so they had to unload that passenger's luggage. We finally took off with 2 hours delay.


Since my lay-over to Athens was only 90 minutes, I knew I'd never make it anyways, so I didn't fret about it. In the worst case I'd spend the night near the airport and travel to Greece the next day.
We made up some time along the way and arrived at Charles de Gaulle only 80 late.

Once I got through arrival procedures, got a new boarding pass for the 18:55 flight to Athens, and made my way to Terminal 2F, I was greeted by this sign:


It's nice to know that Air France has its priorities right. They offered a meal voucher for being late and me having to kill a few hours at the airport.

Friday, June 12, 2015

Travel again


I've been on this flight before, and this photo of AF83 at gate A9 at SFO is at least a little bit better than last time.

Going places ...


A walk in the morning before final preparations for the next trip.

Monday, June 08, 2015

Sunrise

 

I'm in the office early today and caught a nice sunrise across the south bay nature preserve.

Saturday, June 06, 2015

First Schrebergarten done


I finished off the first garden with tomatoes from Scenic Express, and a Heki fruit tree. It's owner enjoys the afternoon sun with a cold beer, and you can tell that he had more than a few beers before ...


I have ideas for the second garden spot. Just need to find some time to turn them into reality.

Schrebergarten: Making the first garden


The paint + sand mix and fences I installed last weekend need more green around them. I started off with some vegetables: Lollo Rosso salad and Kohlrabi from the Busch Nr. 1222 vegetable kit. The planting beds are real sifted dirt from our backyard.


I made a small patio from an Evergreen styrene sheet, added a lawn, and bushes along the fence. The bushes are dark Woodland Scenics clumps topped with Scenic Express SuperTurf. In this photo the lawn is still drowning in glue...


Next I added JTT sun flowers and a path from fine Woodland Scenics ballast. I also glued in some Noch greens and flowers. The flower bushes are overscale for HO, but look reasonable when glued tight together so that it's not quite as obvious how high the supporting fibers are.


Moving on to the Zucchini from the Busch  Nr. 1222 vegetable kit. The plants look great when done, but getting there is a bit painful.


First, paint the zucchini on the sprue. I made them a different green than the sprue and added a hint of yellow. Once the paint has dried it's time to glue the zucchini flowers to the stalk.


I left the flowers on the sprue, and only cut them loose on one side. First glue the stalk to one flower, and cut off the other side of the flower from the sprue. Repeat for the other flower(s). It seems weird at first, but this way it's easy to ensure the tiny flowers go on the stalk instead of your fingers, tweezers, the floor, or you-don't-know-where-else.


The finished plant looks very nice, and almost in scale. I built and planted the plants one at a time, which was probably the most drawn out part of the day.


Hallelujah Papermill: Finished Paper Warehouse installed


I moved the warehouse spur a bit towards the back drop, and the paper warehouse is now set in place in South Hallelujah at Silicon Valley Lines with sufficient clearance to the adjacent track. I spent a good part of the evening to get the remaining Tortoise turnout motors completed and installed, which was made considerably easier with Jeff's help and guidance in positioning.


Having the warehouse in place, it reminded me again just how big this industry really is. I rarely see this kind of setup on model railroads where the rail cars are dominated by the industry buildings around them especially in HO.
The box between the plant office and the warehouse will be some kind of operations building, e.g. a maintenance shop. That could be interesting to build.


The plan is to work my way to the right towards the wood yard and build the various buildings, storage tanks, and connecting infrastructure. Then do a second pass with detailing and scenery. Next up will probably be the paper making building in the background.

Monday, June 01, 2015

Evening Walk



Monday evening.
A perfect time to go on a walk in the Santa Teresa County park and enjoy the slowly setting sun.







Sunday, May 31, 2015

Schrebergarten: Fences


Garden spots are small and of course fenced off. You certainly don't want kids to run across nearby tracks. Another Noch kit provided the fences. When convenient I glued the various pieces together with plastic glue, and mounted them on the baseboard using regular white glue.


Just before dinner, I ran out of fence to install, but you get an idea of how the two garden plots are laid out. Garden plants and greenery is next.


Schrebergarten: Sheds


I had planned the garden spots in Talheim for a while, so I've been collecting various supplies for them over time. One of these is Noch's garden sheds kit. This is a set of small sheds made from laser-cut cardboard. I intend to use the two small sheds, but ended up building all three.


The kit comes with the appropriate glue, so there is no guesswork involved on that front. Putting it together is as easy as one might think (how hard could this possibly be?), and the resulting sheds are surprisingly sturdy.


Shed 1 was put together in no time and is a cute little building. The roof is made from rather thin cardboard. I'll need to take some care when working around these little sheds.


Shed 2 is slightly more involved, but came together quickly as well.


I messed up the wall angles a bit when gluing one side of Shed 3, but noticed it only when reviewing the finished building and wondered where that gap came from. So, as it turns out, while it is an easy kit to build, you still need to pay attention. I forgot to take a photo of Shed 3. Maybe some other day.

I need fences.

Schrebergaerten in Talheim


The area between the Koef shed and the mainline in Talheim has an odd shape. In real life the prototype would allow creation of "Schrebergaerten" (garden spots) on such unusable property along the tracks. I can do the same.

In order to build the gardens off the layout, I cut a base piece from poster board.


I painted the board my standard earth brown, sifted fine sand into the wet paint, and left the board alone to dry, while working on something else.

 
A couple hours later, I returned to the board and ... well, that didn't work. The poster board had warped and the paper cover came off.


On the second try I used insulation board as the base, painted it, sifted sand, and left it to dry.


Time for some sheds.

Saturday, May 30, 2015

Hallelujah Papermill: Plant Office


At first I thought there are parts missing for the plant office, until I realized that the vertical sections are not to be filled with additional plastic pieces, but rather be painted... Hrmpf. Fine. So I did. I spray-painted the walls in a more appealing color than the rather ugly gray molding they came in, and brush painted the vertical sections in Floquil Roof Brown, which creates this rather ugly color combination one often sees in seventies industrial buildings that want to be cool.

The main entrance door was indeed missing, though, along with the canopy over the entrance. The canopy was quickly made from a piece of flat roof. I decided to look at the club for the missing door ... and then changed my mind and built it from strip styrene.


I used Evergreen .030x.040 cut to size on the NWSL Chopper, and a strip of .010x.040 strip styrene for the floor piece.


After testing the fit with some adjustments, I spray painted the door frame and mounted it with the glass from the kit.


The office is quite a bit smaller than I expected, so I decided that it will be some kind of logistics and plant operation office, while the main office is in a nearby town. Because it is so small, I might have to build one more operations or shop building to fill the space along the paper making building.
I'll worry about that another day.


Friday, May 29, 2015

Junior Operator


Train 376 on the way from Nowheres to Bakersfield. Engineer Franziska just got clearance from SVL Dispatch to proceed to the bottom of the loop.

Hallelujah Papermill: Finished Paper warehouse testing


Once I move the spur back a little the warehouse will fit well in the space.


Clearances are fine. As expected, I need to cut back the end wall a little bit, too, to have enough space. I will need to dig out that old track from the homasote.


A car spotted at Door 7.

Wednesday, May 27, 2015

Hallelujah Papermill: Door 7


We're back at the dining table witnessing building surgery. The Dremel is helpful in making the required cuts.


Since this is my last chance of having the wall section flat on a work surface I cut the opening for Door 7 and used a baffle from Walthers "Magic Pan Bakeries" kit to create a weather-proof loading spot.


The roof is puzzled together from several pieces because there was no piece in the box that fit this section of the building. If I had paid a little bit more attention, I could have saved myself some work here. "Measure twice..." and then remember what you measured, instead of measuring a 3rd time and cutting the roof half an inch too short. In the end the roof will be covered with a gravel layer, so it doesn't matter much that the roof structure looks a bit cobbled together.

I let the glue dry completely over night because I need this piece to be stable for the next step.

Tuesday, May 26, 2015

Hallelujah Station


The modified Hallelujah station building now fits perfectly between track and backdrop. We assume that the SVL main (in the foreground) got added later, thus a new platform was built (see mockups along the main) and the station building continued to be used.