Monday, November 11, 2013
Sunday, November 10, 2013
Loading dock
![]() |
| I cut strips of styrene for the foundation walls and glued them to the building base. |
![]() |
| The "wood planking" for the loading docks is cut, scribed, and being painted. |
![]() |
| Test fit. If you look closely you can see the stone sheets laminated on the foundation. |
Thursday, November 07, 2013
Pondering Options
![]() |
| The freight shed put in place in Emsingen |
Things to ponder:
- How far do I extend the foundation of the building to the track and the street?
For the street side I'll follow the kit and make the loading dock a cantilevered wood construction. For the track side I'll do something similar, but pull the building foundation close to the track with only a little bit overhang. Since the track is not perfectly straight I need to make the loading doc follow the track contours. - What foundation material?
Initially I thought I'd build a concrete foundation directly beneath the building, but now I'm leaning towards a cut stone look, ideally with stones sized similarly to the station building, and pull it out to the edge of the loading dock platform towards the station building and the rear. Need to stop by the Train Shop and see what they have available for that. - Extend the loading dock on either side?
I'll leave it as is on the street side, but I might add an extension made from "concrete" that extends into the curve to the right of the boxcar. - Roof material and shape?
I can't quite decide between a tarpaper-like roof, and proper roofing material like on the station building. Currently leaning towards scratch-built tarpaper imitation. - Any stairs or ladders?
Concrete stairs on the trackside next to the end of track, as well as the rear of the building. Wooden ladder or stairs on the street side. - Where to put lights?
Put LEDs or small bulbs under the eaves of the roof in two locations on both sides along the length of the building. Maybe above the doors? - Anything for the interior?
I'm planning to build a shadow box for the track side door with limited visibility into the building. I might model a small office behind the window facing the station building.
Monday, November 04, 2013
Adding dirt and moisture
The walls put together and set on the base:
I used light grey and black Bragdon weathering powders to blend colors together and add some patina to the wall sections (compare to yesterday's post).
The effect is startling. I can almost smell the moisture creeping up in those walls...
I later realized that this is better done when the model is put together to get a consistent look around the corners. However, doing this with the walls flat on the bench allowed me to experiment with the process, so it was still useful this way and I can apply what I learned the next time I use this technique.
![]() |
| View from the street |
![]() |
| View from the tracks |
The effect is startling. I can almost smell the moisture creeping up in those walls...
![]() | ||
| Added appropriate dirt and weathering |
Sunday, November 03, 2013
Emsingen freight shed walls ... scratch-built
I spent the evening on completing the wall sections for the freight shed. It took a considerable amount of time to cut the openings for the doors in the new walls without breaking the walls. I also built the actual doors, but didn't make them movable. Finally, the new walls got multiple coats of paint. An airbrush would make this a lot easier and quicker...
![]() |
| The upper walls is track-side and not touched yet. The lower wall will be facing the street, and has the door opening cut already, as well as a first coat of paint. |
![]() |
| 2.5 hours later: The street side now has the door built installed. The track side wall has the opening cut. |
I'm using fairly heavy sheet styrene as the base of the walls. It's what I had available in the right size. The boards for the siding are Evergreen #2100 V-Groove, .100" spacing, .020" thick laminated on the base. The doors are made from the same material, and laminated with Evergreen #103 .010 x .060" strip styrene. ... yes, those are 0.25mm thin.
![]() |
| Another hour later: All walls have the third coat of paint. The doors are done, and I'm getting close to done with this part. Track-side on top, street-side at bottom. |
Friday, November 01, 2013
SVL 378
Tonight I ran the one remaining train from last week's Ops session at Silicon Valley Lines.
![]() |
| Engine 3050 pulls train 378 from Nowheres to Jasper Junction, at Mt. Marvel. |
Tuesday, October 29, 2013
Adventures in scratch building
Given that I'm only re-using three walls of the freight shed from Faller's Trossingen kit, and they make up less than half of the building, I'm basically scratch building the freight shed for Emsingen.
The scratch build part will have loading doors as well, but I'll model them "closed", and glue them on top of the wall boards. ... Oh, shoot! The sliding doors hang on the inside of the building. Sigh. Won't get around creating those wall openings.
![]() |
| The shed as seen from the street. |
![]() |
| ... and the view from the tracks. |
![]() |
| The lower wall is from the Trossingen kit. I cut off the original flat gable and added a sharper one. |
![]() |
| Testing the effect with the card board roof. |
![]() |
| ... and the other side. I won't add a window in this wall. |
Sunday, October 27, 2013
Metrolink Highrailer in Burbank, CA
For Maintenance Of Way activities pretty much all US railroads use SUVs fitted with small wheels that fit on the track and guide the car.
Layout Computer Shenanigans
Snowy is the Ubuntu machine controlling my layout with JMRI. I used an old Antex Sonata multimedia case for this machine.
Last Saturday, there was an "electric smell" in the garage. It took us a little while to locate it, but, you guessed it, the power supply in Snowy was dead, and I immediately suspected a popped capacitor in the power supply. Time for a new one. I got the old one out, drove down to Central Computers and ... learned that this power supply is specially made for the Sonata case, and no longer available. Well, at least they didn't have any that would fit. So I ended up spending a little bit more and got a new CoolerMaster case with power supply included.
While at it, I decided to do what I always wanted to do and mount a computer screen in a corner above the layout. Big daughter is abroad for a year, and she's mostly using her laptop anyways, so that nice 17" monitor got mounted to a wall bracket and installed above the Emsingen roundhouse.
Today I put it all together again. Here are a few shots of what the setup looks like now.
With the old case it always bugged me that I had to open a server cabinet door to turn on the computer. For the new setup, I took the power button socket from the old case, extended it and added a push button at the far end. The button is now mounted to the shelf on the side of the cabinet and conveniently accessible.
Last Saturday, there was an "electric smell" in the garage. It took us a little while to locate it, but, you guessed it, the power supply in Snowy was dead, and I immediately suspected a popped capacitor in the power supply. Time for a new one. I got the old one out, drove down to Central Computers and ... learned that this power supply is specially made for the Sonata case, and no longer available. Well, at least they didn't have any that would fit. So I ended up spending a little bit more and got a new CoolerMaster case with power supply included.
While at it, I decided to do what I always wanted to do and mount a computer screen in a corner above the layout. Big daughter is abroad for a year, and she's mostly using her laptop anyways, so that nice 17" monitor got mounted to a wall bracket and installed above the Emsingen roundhouse.
Today I put it all together again. Here are a few shots of what the setup looks like now.
![]() |
| The screen is mounted to the beam above the Emsingen roundhouse. The cables for power and video signal go down the server in the triangular channel in the corner. |
![]() |
| The screen is big enough to show the JMRI layout editor view of the whole layout, plus imagery from hidden staging. The red lines show occupied tracks in Emsingen. |
![]() |
| On the left is Chef, our home server. On the right is the new Snowy case, and the UPS on the far right. |
![]() |
| Snowy's power button is the small black push button mounted to hard board in the center of this picture. |
Monday, October 21, 2013
Monday, October 07, 2013
A Bridge
In preparation for a school project, Pascal decided this afternoon to build a through-truss bridge ...
All by himself...
From tooth picks and hot glue!
All by himself...
From tooth picks and hot glue!
Even the beams running the length of the bridge are made from tooth picks. Pascal first built the end supports, then the lower beams and the truss on each side. Afterwards he connected the trusses at the top, and built the deck.
Sunday, October 06, 2013
Attack of the Boy
This is what's left of our old kitchen mixer after Pascal wanted to know what it looks like from the inside...
Saturday, October 05, 2013
Emsingen Freight shed mock-up
The freight shed sits at to the "Gueterschuppen" track next to Emsingen station.
![]() |
| Emsingen main station and freight shed mock-up. |
![]() |
| Aerial view of station area. |
I want the shed to not look silly when putting two freight cars next to it, so it needs to be a decent size. Since I'm kit-bashing it, I'm assuming that it was originally built smaller, and expanded later to double its size. The parts I have call for a single-story building with a fairly low angled roof.
![]() |
| The footprint of shed feels a bit large but works well with the freight cars at the loading dock |
![]() |
| The loading dock wraps around one side of the freight shed. Dock height will be set to meet car floor at level height. |
Figuring out what the freight shed is going to look like
Now that the Emsingen station building is basically complete, I need to figure out what the freight shed is going to look like. This will be kit-bashed from parts of the attached freight shed included with the kit, and styrene sheets. Do I want two doors to the loading platform or one? Which wall segments will be built from kit parts, which from styrene parts? Do I want to build the shed to the size of roof parts I have? If bigger, should I cobble together the roof from cut parts, or build a roof from scratch?
...
So many questions to answer.
Before cutting styrene I should make a cardboard mockup.
Wednesday, September 25, 2013
This is it.
Time for my flight home. Can't wait. It was really nice spending time with family the last few days, but I'm ready to go home. Two and half weeks is a long time to be away.
Here's a shot from our weekend walk at Monrepos.
The photo quality of my cell phone doesn't even pretend to be near what Tatjana's camera produces.
Here's a shot from our weekend walk at Monrepos.
The photo quality of my cell phone doesn't even pretend to be near what Tatjana's camera produces.
Tuesday, September 24, 2013
Monday, September 23, 2013
Sunday, September 22, 2013
Tiersteintunnel
On the way from Zurich to Stuttgart as usual I was watching the scenery outside the windows of IC184. Between Rottweil and Horb the track tunnels through several hills along river Neckar, and to my utter surprise at one of the tunnel portals I read the sign "Tierstein-Tunnel".
I later looked up the Gaeubahn on Wikipedia, and indeed there is a "Tierstein-Tunnel", followed by "Hohenstein-Tunnel", whose name is awfully close to my "Hochwald-Tunnel". It's amazing how sometimes completely made-up names can be found in reality, not that far away from where I imagined they could be located in my model.
rottweil.net has a few very nice photos of the tunnel portal that in an instant had me wide awake on Friday afternoon.
I later looked up the Gaeubahn on Wikipedia, and indeed there is a "Tierstein-Tunnel", followed by "Hohenstein-Tunnel", whose name is awfully close to my "Hochwald-Tunnel". It's amazing how sometimes completely made-up names can be found in reality, not that far away from where I imagined they could be located in my model.
rottweil.net has a few very nice photos of the tunnel portal that in an instant had me wide awake on Friday afternoon.
Saturday, September 21, 2013
"Critical" Supplies
A visit at Zuri-Tech yielded a nice set of second-hand Maerklin D-Zug-Wagen. While they are compressed in length, the cars will look reasonably ok on the fairly tight radi used on the Welztalbahn. This gives me the material to model a detoured long-distance D-Zug during operations, and they just look good for an Open House setup.
I also couldn't resist the siren call of a Roco Rungenwagen, and some figures to populate the farmers market in the town of Emsingen. All of the items were on sale so the damage to my wallet wasn't too horrible.
I also couldn't resist the siren call of a Roco Rungenwagen, and some figures to populate the farmers market in the town of Emsingen. All of the items were on sale so the damage to my wallet wasn't too horrible.
Subscribe to:
Posts (Atom)



































