|
I cut strips of styrene for the foundation walls and glued them to the building base. |
|
The "wood planking" for the loading docks is cut, scribed, and being painted. |
|
Test fit. If you look closely you can see the stone sheets laminated on the foundation. |
Next up is prepping the site for the shed on the layout and locking down the exact location where the building is going to sit. Then I'll need to match the track side loading dock to the contours of the adjacent track before finishing up detailing of that side of the building. Also starting to look into building the roof and thinking about the shadow box at the loading door.
No comments:
Post a Comment